Nawara Development Project - Pipeline

Northern Africa - Tunisia

Country:
TUNISIA
Business Area:
OIL & GAS
Services:
Nawara - Engineering of over 370km of pipeline and services

The objective of the Nawara Development Project is to recover the associated and nonassociated gas reserves from the Nawara Concession, separate and pretreat the fluids from 9 wells, gather them in Central Processing Facility (CPF), convert them into a commercial condensate and pre-treated gas, export the condensate via a new pipeline into the existing TRAPSA pipeline, and export the gas via a new pipeline to Gabès. At Gabès, the gas will be treated in a dedicated Liquefied Petroleum Gas (LPG) extraction facility to commercial specification required for end user consumption. In Gabès, the gas will be conditioned in a Gas Treatment PLANT (GTP) into commercial products, and sold to the end users. Enereco's scope of work within this project includes:

Gas Pipeline ND 24” from Nawara to Gabès GTP (KP 0 - 370) from pig launcher  at Nawara CPF to the pig receiver at Gabès GTP, including n. 12 break line valve stations

Condensate Export Pipeline ND 6” (KP 0–12) from Nawara pig launcher to a tie-in point (hot tap) on the existing TRAPSA pipeline.

Enereco is carrying out the detailed design and providing support to the procurement activities.