Fuel Oil Pipeline from Shuaiba Refinery to Shatt Al-Basrah Power Station
Country: Iraq
Client: SCOP
Activity: Pipeline – Oil & Gas
Enereco scope of work consists of the design, procurement and delivery of the 12’’ pipeline to transfer fuel oil from Shuaiba Refinery to Shatt Al-Basrah Power Station in south of Iraq, as well as supervision of the installation, commissioning and test run.
The pipeline is roughly 10 km long and consists of both above ground and buried sections thermally insulated and electrically heated.