CONSTRUCTION MANAGEMENT OF A NATURAL GAS PIPELINE DN 56’’ DP 75 BAR, 22 KM LONG
Country: Italy, Melendugno – Brindisi (Puglia)
Client: Snam Rete Gas
Activity: Pipeline – Oil & Gas
FIELD SERVICE & CONSTRUCTION MANAGEMENT
Enereco has performed the Construction Management for the Natural Gas Pipeline – Tap Interconnecting Lotto 1 and related works. This pipeline runs along a North-West route in the East of Apulia for a total length of 55,532km. It crosses the following municipalities: Melendugno, Vernole, Castrì di Lecce, Lizzanello, Lecce, Surbo, Torchiarolo, San Pietro Vernotico and Brindisi.
Natural Gas Pipeline – Tap Interconnecting is functional to the national network supplying natural gas through Trans Adriatic Pipeline, a part of the Southern Gas Corridor which transports in Europe the natural gas from Azerbaijan to Italy.
Several plants such as Pipeline Interception Points and SRG Terminal in Melendugno have been realized as well.
The work has been performed thanks to “trenchless” construction techniques to reduce the environmental and landscape impact.
Buildability
The final goal has been reached as the natural pipeline has been realized respecting the project technical and construction specifications as well as environmental regulations and Authorities constraints:
- Project review in accordance to those criticalities come to light during the construction phase
- low environmental impact works for the environment and landscape safeguard
TAP is now an essential part of the continent’s gas network. “I’m proud Enereco was part of a so strategic project. Good Job Boys!”
Mario Lanzetta
Project Manager
Challenges
1
The construction of Natural Gas Pipeline – TAP INTERCONNECTING lotto 1 DN 1400 (56”) has represented a continuing challenge for sticking to the expected delivery times
2
The route crosses areas which are important from a landscape and environmental point of view.
3
The work finalisation and start up was deeply connected to TAP.
TODAY
- Considerable presence of dry stone walls used to delimit rural areas
- Crossing of areas where olive trees are cultivated
- Covid-19 sanitary emergency has influenced 2/ 3 of work duration
- Continuous coordination with Institutions and private citizens to assure the completion within the expected dates.
Tomorrow
Field problems have been efficiently managed through the planning and operational coordination with Institutions and private citizens , assisted by Enereco engineers’ presence.
Activities have been performed without any health problem thanks to the organization on site and the implementation of preventive and protection measures.