LPG pipeline LZ2 24’’ Hassi R’mel-Arzew, 508km

Africa - Algeria

Country:
Algeria
Business Area:
OIL & GAS
Client:
Saipem for Sonatrach
Services:
The project consisted of a new LPG pipeline, about 500 km long.

ALGERIA - LPG pipeline LZ2 24’’ Hassi R’mel-Arzew, 508km

Client:           Saipem for Sonatrach

 The project consisted of a new 24" pipeline, about 500 km long, for conveying LPG at a flow rate of 6÷9 MTA (1350÷ 2025 m³/h). The project also included:

  • a new pumping station for the new 24’’ (LZ2) and existing 24’’ (LZ1) pipelines located at Hassi R'mel, complete with high grade filtration system (cartridge and basket filters).
  • 1 pig launching and receiving station.
  • 1 pig launching and receiving station with emergency block valves at Sougueur.
  • 29 block valves.
  • pressure reducing/control at Arzew station.

Enereco carried out the bid engineering, basic and detail design, assistance to procurement activities, vendor post-order follow-up and expediting assistance, as well as part of the electrical and mechanical works supervision.